Job Description
Preparation and checking of Telecom documents- Telecom data sheets and specification, Telecom System modification scope of work, Telecom Design basis, Telecom equipment index,
Responsibilities
• Preparation and checking of Telecom documents- Telecom data sheets and specification, Telecom System modification scope of work, Telecom Design basis, Telecom equipment index, • Engineering design of Optical Link Loss Budget Calculation for Fiber optic networks, (Backbone cabling networks, Engineering design of CCTV Storage Calculation • Review and checking of Telecom drawings-Telecom cable block diagram, Overall Telecom Architecture diagram Schematic wiring diagram, Interconnection diagram, Telecom Cable schedule, Telecom equipment Location layout drawing, Telecom room equipment Layout drawing, MCT drawing, Telecom Cable routing and trench layout drawings, Bill Of Materials, Telecom Earthing Diagram, • Inputs to deliverables by various other departments-Input to design basis memorandum, Input to Material requisition for equipment, Input to Telecom room layout, Input to Cable Trench layout, Input to offshore oil production platform layouts, Input to offshore platform structural weight control report, Input to Electrical power load and heat load calculation, Input to Fire & Gas Philosophy, Input to overall operational narrative and control philosophy. • Inter-discipline review of deliverables from other departments- Plot plan, Piping GA drawings, Equipment layouts, Electrical single line diagrams, HVAC duct layouts, Hazardous area classification drawings, Review of F&G Layout drawings • Procurement assistance- Preparation of Material Requisition and Technical Bid Evaluation for Telecom equipment and systems • Vendor drawing review for Telecom equipment and systems, equipment packages (containers) • Data retrieval, Site survey (Offshore & Onshore) & site survey reports generation • Participation to risk reviews like Hazid • Input to AVEVA and report generation • Proposal activities-Review of project scope, Technical clarification, prepare list of activities and deliverables required, estimation of man-hours, preparation of method statement, Scope split matrix with EPIC Contractor, Scope of work for Third party services. • Response to Site technical queries, Site commissioning Support • Secondment to Client office (If required)